FCGMA

Groundwater Extraction Reporting

2025-2 Semi-Annual Extraction Statements (SAES) for wells located in Oxnard, Pleasant Valley, and Las Posas Valley Basins are due November 15, 2025.
To ensure accurate reporting for the 2025-2 period (covering extractions from April 1 to September 30, 2025), collect meter readings from and meter photos taken on September 30, 2025.
Online Reporting
Required Reporting Materials for 2025-2 SAES Submission

 

Compliance Requirements

Per Agency Ordinance Code, completed and accurate SAES must be received by the due date. Forms postmarked by the U.S. Postal Service on or before the deadline will be considered on time. Failure to report, or submitting incomplete or incorrect forms, may result in:


Manual Reporting Required for Certain CombCodes: 
online reporting is not permitted for CombCodes with: missing or incomplete previous SAES, or unregistered FlowmeterOperator, or Owner changes. These must be reported manually using the Agency-provided SAES form.