Área de gestión de tierras de Fox Canyon
Fox Canyon Groundwater Management Agency will hold 5-Year Groundwater Sustainability Plan (GSP) Evaluation workshops for the Las Posas Valley Basin, Oxnard Subbasin, and Pleasant Valley Basin, and the draft documents for each Basin are now available for your review prior to the workshops.
Cuando:
Cuenca del Valle de Las Posas (LPV): Lunes 9 de septiembre de 2024, de 18 a 20 horas
Cuencas de Oxnard y Pleasant Valley (OPV): Martes 10 de septiembre de 2024, de 18 a 20 horas
Dónde:
Sala de reuniones de la plaza inferior (LPAR), 800 S. Victoria Ave, Ventura, CA 93009
Damas:
LPV 5-Year GSP Evaluation Draft Documents
Oxnard 5-Year GSP Evaluation Draft Documents
Pleasant Valley 5-Year GSP Evaluation Draft Documents
The Sustainable Groundwater Management Act (SGMA) requires periodical evaluation of GSPs at least every 5 years. The upcoming workshops are intended for review and comment on the 5-Year GSP Evaluation draft documents.
We encourage you to access the draft documents ahead of time in case you would like to prepare comments. Submit written comments to FCGMA prior to close of business (COB) on Monday, October 7El, 2024. Written comments received on or before October 7 will be considered for inclusion in the final draft evaluations. Please send written comments to FCGMA@ventura.org.
Please note that these workshops will be held in-person only. Both workshops will be held in the LPAR, which is located one floor below the Board of Supervisors Hearing Room (where the FCGMA Board usually holds its meetings). After entering the Hall of Administration, walk across the lobby to the stairs leading down from the escalator, and take the stairs to the lower level. As you exit the stairs, you’ll see doors to the LPAR and the cafeteria to your left. Enter the doors closest to the vending machines; that is the entry into the assembly room. Consulte la página 2 de este folleto para ver un mapa que puede resultar útil..